Recent

The Nepal Electricity Authority


Kathmandu, May 7 - The Nepal Electricity Authority has begun to be applied is reduced by one hour load-shedding. Now is the daily 10-hour load shedding. River water level has been reduced by increased shedding of electricity production improved, according to the NEA demand chavidyuta 1 thousand 350 MW and 620 MW electricity is being supplied to India and is even. Similarly, the system of supply of 680 megawatt at least 10 hours after the daily load-shedding has. India and Nepal utpadita power is equal to the rectangle.
Share on Google Plus

About skynewsnepal

0 comments:

Post a Comment